Line properties
Length: 23.1 kilometres, of which
| 6.8 kilometres | (Chemnitz Hbf. - Chemnitz-Altchemnitz, 2-track tram line of the CVAG) and | 
| 16.3 kilometres | (Chemnitz-Altchemnitz - Stollberg, single-track branch line, leased from DB and operated by CBC) | 
Speed:
| Vmax = | 60 km/h | between Chemnitz Hbf. and Chemnitz-Altchemnitz (BO-Strab) and | 
| Vmax = | 80 km/h | between Chemnitz-Altchemnitz and Stollberg (EBO) | 
Travel time and speed, driving programme:
| Chemnitz main station - Stollberg in 49 minutes (28.3 km/h) | 
| 33 train pairs on weekdays (except Saturday) | 
| 25 pairs of trains on Saturdays | 
| 19 pairs of trains on Sundays and public holidays | 
Start of operation by City-Bahn Chemnitz GmbH:
| 15 December 2002 | 
Vehicles used:
| Regio-Variobahnen NGT6-LDZ (Monday to Saturday four vehicles, on Sundays and public holidays two vehicles) |