GDL strike announced
Period: 07.12. in the evening up to and including 08.12.

Construction sites hinder Chemnitz City-Bahn in April

  • Infrastructure operators build tracks
  • The C11 (Chemnitz Stollberg) and RB 92 (Stollberg Glauchau) are particularly affected
  • City-Bahn operates rail replacement services there on a daily basis

Chemnitz - The month of April brings a lot of rail replacement services for City-Bahn passengers due to roadworks. The lines between Chemnitz Stollberg Glauchau Gößnitz are particularly affected. The replacement timetables can be found at www.city-bahn.de.

C11 (Chemnitz Stollberg): rail replacement service (SEV) between 2 and 4 April 2024 on the entire line due to construction work. Between 5 and 9 April SEV only on the Chemnitz Hauptbahnhof Altchemnitz section. Attention: The departure and arrival times of the SEV differ from the usual timetable.

RB 92 (Stollberg St. Egidien Glauchau): SEV between 2 and 9 April 2024 on the Lichtenstein Glauchau section due to roadworks. Between 10 and 12 April, SEV will run on the entire route. Please note: The replacement buses cannot directly serve the Neuoelsnitz, Oelsnitz Bahnhofstraße, Rödlitz-Hohndorf and Lichtenstein Hartensteiner Straße stops due to roadworks. Between 13 April and 4 May, there will be another SEV on the Lichtenstein Glauchau section. The departure and arrival times of the SEV deviate from the usual timetable.

RB 37 (Glauchau Gößnitz): no train services from 23 to 25 April due to roadworks. The departure and arrival times of the SEV differ from the usual timetable.

Due to an accident-related defective Citylink (see CBC-PM 1/2024), line C15 (Hainichen Chemnitz Technopark) continues to terminate at Chemnitz Central Station. From 15 to 19 April, SEV will run between Chemnitz main station and Hainichen station.

Contact

Falk Ester

Press spokesman City-Bahn Chemnitz

Phone: +49 151 171 036 60
Mail: presse@city-bahn.de